一份船舶建造合同

YACHT BUILD AGREEMENT

DATED: 22nd December 20xx年

between

AAA‘s Yacht Company Limited, Hong Kong. (Hereinafter referred to as “the Builder”)

and

BBB CC, Vietnam, (Hereinafter referred to as “the Buyer”)

WHEREAS:

1) The Buyer wishes to acquire a AAA‘s Cape 65 Trawler Yacht (the yacht) designed by Thanos Condylis, and built to the Buyer’s stated requirements and specification, and the Builder has the capability, knowledge and skills to build and supply the same.

2) The Builder has agreed to construct, equip, fit-out, test and deliver the Yacht to the Buyer‘s stated requirements and specification, which the Buyer has agreed to accept upon the terms and conditions here in after specified:

Now therefore the Parties hereto have agreed and do hereby agree as follows:

ARTICLE I - INTERPRETATION

1) In this Contract the following words and expressions shall have the meaning hereby ascribed to them, except where the context otherwise admits or requires:

“Banking Days” Shall mean days upon which Hong Kong clearing banks are customarily open for business.

“the Builder‘s Clarifications” Shall mean the documents so entitled forming part of this Contract and set out as Annexes hereto; (See also Item (2) of this Article.)

“Buyer‘s Representative(s)” Shall mean such persons notified from time to time by the Buyer as having authority to act for the Buyer, the extent of such authority being set out in the notice;

“Items of Buyer‘s supply” Shall mean any item of equipment and stores for the Yacht ordered by the Buyer direct from the manufacturer or the supplier, for incorporation in the Yacht by the Builder;

“Items of Builder‘s supply” Shall mean any item of equipment and stores for the Yacht ordered by the Builder direct from the manufacturer or the supplier, for incorporation in the Yacht;

“the Certifying / Survey Body” Shall mean the body responsible for the survey and certification of the yacht to the requirements of the buyer.

“the Contract” Shall mean (a) this Contract, and (b) the attached Annexes and schedule more particularly described below.

“the Contract Delivery Date” Shall mean no later than 30 June 20xx年;

“the Contract Master Programme” Shall mean the programme for construction of the Yacht, set out in Annex D;

“the Contract Price” Shall mean the price stipulated in Article V for the Yacht, Yard Number 005;

“the Yacht” Shall mean the yacht the subject of this Contract and generally as described in Article II, with all the machinery, apparatus, outfit, materials, and equipment appurtenant thereto, but excluding the items of Buyer‘s supply.

“the Boatyard” Shall mean AAA‘s Yacht Company, Xinhui, China.

“the Design Specifications” Shall mean the specifications, designs, plans and drawings, set out in Schedule A, prepared and signed by the Buyer, identified as forming part of this Contract, and including such revised or supplemental specifications, plans and drawings as may subsequently be agreed between the Buyer and the Builder PROVIDED that (i) in the case of any inconsistency between any Article or paragraph of this Contract and the Design Specifications, this Contract shall prevail, (ii) in the case of any inconsistency between the Design Specifications and a plan or drawing, the Design Specification shall prevail, and (iii) in the case of any inconsistency between one plan or drawing and another plan or drawing, the later in date shall prevail;

"Schedule A" Shall mean the agreed schedule of drawings

“Annex A” Shall mean the list of materials, components and equipment defining a completed yacht;

"Annex B" Shall mean the agreed weld quality procedures

“Annex C” Shall mean the agreed Shot Blasting, Fairing, Painting and foaming Specifications

"Annex D“ Shall mean the agreed production schedule master program.

“Specified” Shall mean stipulated in the specifications and Annex A;

“Supplier” Shall mean any person, firm or company, which has entered into a contract with the Builder for the supply of materials, machinery, services or equipment (other than items of Buyer‘s supply) for the yacht;

The Index, Article and paragraph headings, are inserted for convenience only and shall not affect the construction of this Contract.

Words importing the singular shall include the plural and vice versa.

2) List of Builder‘s clarifications, not covered in Annex A document:

“Cradles for Transport” The supply of a Cradle for shipment is excluded from this Contract.

“Dressing/Stepping the Mast” The dressing and stepping of mast for the Yacht is included in the Builder‘s supply.

“Storage” The Builder will arrange secure storage ashore for the Yacht at the Boatyard between completion of build and handover at delivery.

查看本合同更多推荐:〖 一份 船舶 建造

相关合同

一份标准借款合同

甲方(借款人):_____________________身份证号码:_________________________住址:_________________

  • 查看合同
  • 一份简单租房合同

    出租方:__________(以下简称甲方)身份证号:_______________承租方:__________(以下简称乙方)身份证号:___________

  • 查看合同
  • 一份标准借款合同

    甲方(借款人):_____________________身份证号码:_________________________住址:_________________

  • 查看合同
  • 如何审好一份《合同》?

    第一;要首先审查合同的效力问题,要看其是否有《民法典》第52条出现的5种无效情形。第二;要审查合同的主体,看其是否具备合同的主体资格,是否能独立签订这份合同;签

  • 查看合同
  • 一份简单房屋租赁协议

    租赁合同出租方(甲方):XXX承租方(乙方):XXX身份证号码:_______________甲、乙双方就房屋租赁事宜,达成如下协议:一、甲方将其有权处分的位于

  • 查看合同
  • 一份感人辞职申请书

    尊敬的领导:暮然回首,已与公司一同走过XXX时光;再三思量,虽有不舍,仍抬起沉重的双手落成这封申请书。尊敬的领导,很感谢您抽出时间看这封辞职申请,很抱歉辜负了您

  • 查看合同
  • 一份标准辞职申请书

    尊敬的李总:您好!很遗憾在这个时候向xx正式写出辞职申请书,或许我还不是正式职工,不需要写这封辞职申请书。当您看到这封信时我大概也不在这里上班了。来到这里也快两

  • 查看合同
  • 一份简单随用《借款协议》

    借款协议甲方(出借人):住址:身份证号码:乙方(借款人):住址:身份证号码:  为了明确责任,恪守信用,在双方自愿、协商情况下特签订本合同以资共同信守。一、借款

  • 查看合同
  • 宅基地买卖协议一份

    甲方:___身份证号码___乙方:___身份证号码___乙方购买甲方房屋,双方经友好协商达成如下协议以资共同遵守:一、甲方转让的宅基地位置为__________

  • 查看合同
  • 船舶建造合同

    船号:__________本合同由依照________法律组建和存在,并以_________为注册营业地的_________为一方(以下简称买方),和依照中华人

  • 查看合同
  • 一份船舶建造合同

    热门推荐
    分类推荐
    猜你喜欢
    关于我们 |   免责声明 |  侵权投诉 |  网站地图 |  联系我们 |  帮助中心 
    苏ICP备16007902号-117 |   苏公网安备 32081202000281号
    淮安守皓信息技术有限公司 © 版权所有